How Long Does It Typically Take to Remodel a Kitchen in Chicago?

Published:
January 14, 2026
By Lukas Saluda

In Chicago, a kitchen remodel typically takes anywhere from 1 to 4 months of active construction, depending on the project’s complexity. When you factor in the initial planning, design, and permit approvals that the City of Chicago requires, the total timeline usually spans 3 to 7 months from the first consultation to the final walkthrough.

As a Chicago home remodeling company serving Chicagoland homeowners for over 20 years, Majestic Tiles has guided hundreds of families through successful kitchen remodeling projects.  We know firsthand what realistic timelines look like for different renovation types.

Average Kitchen Remodel Timeline by Project Type

Different renovation levels demand different timeframes. Here's what you can expect for each.

Project Type Construction Duration Total Timeline (Planning to Finish) Scope of Work
Minor Update 1-3 weeks 1-2 months Cosmetic changes: painting cabinets, new backsplash, and appliances.
Standard Remodel 4-8 weeks 3-4 months New cabinets/counters in the same layout; flooring and lighting updates.
Major Transformation 8-16 weeks 5-7 months Structural changes, moving plumbing/electric, and custom cabinetry.

To avoid delays, we recommend finalizing all design decisions and ordering materials before demolition begins.

Timeline: Construction runs eight to twelve weeks for most major remodels, though complex projects can extend to sixteen weeks. Comprehensive renovation timelines, including planning, stretch to five to seven months.

Key Factors That Impact Your Kitchen Remodel Timeline

Before diving into detailed phases, you need to understand the variables that affect how long your project takes.

Project Scope and Complexity

A cosmetic refresh takes less time than a complete overhaul. Simple updates may be completed in one to two weeks, while full-scale remodels involving structural changes can take up to three months.

Material Lead Times

Your material choices significantly impact timing:

  • Stock cabinets: 1-2 weeks delivery.
  • Custom cabinetry: 6-10 weeks fabrication.
  • Countertops: 2-3 weeks from template to installation.
  • Specialty tiles and fixtures: 3-6 weeks or longer.

Contractor Availability and Coordination

Peak renovation seasons in Chicago run from March through July, when contractor schedules fill quickly. Professional contractors manage multiple trades — electricians, plumbers, HVAC specialists, and finish carpenters — requiring expertise and planning.

Permit Requirements and Inspections

Chicago building permits can take anywhere from one week to several months, depending on the project’s complexity. Simple renovations might not require permits, but projects involving structural changes, electrical upgrades, or plumbing modifications always do. Budget two to four weeks for permit approval.

Unexpected Discoveries

Older Chicago homes frequently hide surprises such as outdated wiring, plumbing issues, water damage, or structural problems. The National Association of the Remodeling Industry recommends building a 10-15% time cushion into your schedule.

Unexpected Discoveries

Phase-by-Phase Kitchen Remodel Breakdown

Breaking down the renovation process helps you prepare for each stage and set realistic expectations.

Phase 1: Planning and Design (2-8 Weeks)

This phase establishes your project's foundation:

  • Assess current kitchen shortcomings and goals
  • Plan budgeting for your kitchen project, including contingency funds
  • Research and hire qualified contractors
  • Create detailed floor plans and layouts
  • Select style preferences and materials
  • Finalize selections and place orders

During this phase, you can move at your own pace. Working with experienced professionals streamlines this process significantly. At Majestic Tiles, we guide clients through material selection in our Wheeling showroom.

Phase 2: Permits and Approvals (1-6 Weeks)

Before construction begins, ensure all necessary permits are secured:

  • Submit detailed plans to the building department
  • Wait for plan review and permit approval
  • Schedule required inspections
  • Coordinate with building management (condos/co-ops)

Chicago permitting timelines vary by complexity. Simple renovations might receive approval within one week, while complex projects can take six weeks.

Permits and Approvals

Phase 3: Demolition (2-5 Days)

Demolition marks active construction beginning:

  • Remove existing cabinets, countertops, and appliances
  • Tear out old flooring and backsplashes
  • Expose walls for plumbing and electrical work
  • Dispose of debris and materials
  • Protect adjacent rooms from dust

Most demolition finishes within two to three days for standard kitchens.

Phase 4: Rough Construction (1-3 Weeks)

Rough construction installs infrastructure:

  • Structural modifications (walls, windows, doors)
  • New electrical wiring and outlets
  • Plumbing line relocation or upgrades
  • HVAC ductwork installation
  • Support structures for countertops

Each trade works in sequence, with inspections at multiple points. Budget one to three weeks for this phase, depending on complexity.

Rough Construction

Phase 5: Drywall, Painting, and Flooring (1-2 Weeks)

Finish work begins:

  • Install and finish drywall
  • Prime and paint walls and ceilings
  • Install new flooring (timing depends on type)

Some flooring installs before cabinetry, others afterward. This phase typically requires one to two weeks.

Phase 6: Cabinet Installation (3-7 Days)

Professional installers transform your space:

  • Place and level base cabinets
  • Hang wall cabinets at proper heights
  • Install crown molding and trim
  • Adjust all doors and drawers

Quality installation takes three to five days for standard kitchens, up to one week for extensive custom cabinetry.

Phase 7: Countertops (2-3 Weeks)

Countertop installation happens in stages:

  • Create precise templates after the cabinets are in place
  • Fabricate material at the shop
  • Install finished countertops

This process typically takes two to three weeks from template to installation.

Countertops

Phase 8: Backsplash and Tile Work (2-5 Days)

Tile installation requires precision:

  • Layout tile patterns
  • Install tiles with appropriate spacing
  • Allow mortar to cure (24 hours)
  • Apply grout and clean surfaces
  • Seal grout after curing

Standard backsplashes take two to three days, and complex patterns can take up to five days.

Phase 9: Final Installations (3-5 Days)

The finishing phase that brings everything together:

  • Install and connect appliances
  • Mount sinks and faucets
  • Install lighting fixtures and switch plates
  • Add cabinet hardware
  • Complete any remaining trim work

This phase typically requires three to five days.

Phase 10: Final Inspections and Walkthrough (1-2 Days)

Before project completion:

  • Schedule final inspections with building officials
  • Conduct a detailed walkthrough with the contractor
  • Create a punch list of remaining items
  • Receive warranty documentation

Address punch list items within one to two days. From there, sit back, relax, and enjoy your new kitchen.

Final Inspections and Walkthrough

How to Keep Your Kitchen Remodel on Schedule

Even well-planned renovations face potential delays. We’ve outlined some strategies that can help you minimize disruptions:

  • Make decisions early: Finalize all major decisions during planning before construction begins. When you change your mind about cabinet colors, countertops, or appliances mid-project, it causes significant delays and cost overruns.
  • Order materials in advance: Have everything delivered and stored before construction begins, when possible. Missing materials halt progress, leaving contractors idle while you wait for back-ordered items.
  • Maintain open communication: Schedule regular check-ins with your contractor. Discuss concerns immediately rather than waiting. Respond quickly to questions about selections or approvals.
  • Create a temporary kitchen: Set up a temporary space with a microwave, coffee maker, mini refrigerator, and basic supplies. This preparation reduces stress and keeps your household functioning.
  • Build in contingency time: Add 10-15% buffer time to your schedule, as even perfectly planned projects encounter unexpected issues.
  • Work with experienced professionals: Partner with contractors who specialize in kitchen renovations. Their expertise helps anticipate problems, coordinate trades efficiently, and keep projects moving forward.

Perfect Your Chicago Kitchen with Majestic Tiles

Chicago kitchen remodeling takes three to six months from initial planning to final walkthrough, with construction lasting four to 12 weeks, depending on the scope.

Majestic Tiles brings over 20 years of Chicago-area expertise to every project, specializing in high-quality materials, including exclusive European tile collections that transform ordinary kitchens into extraordinary spaces. We’re here to help you improve the heart of your home.

Contact us today to discuss your vision, explore our Wheeling showroom, and receive honest guidance for your specific project timeline.